Hi
@Chris Cover,
When I look at Intraday Monitoring I can see a column called "FTEs Difference".
This appears to be the difference between Forecast FTEs (which I assume is what you are referring to when you say Required FTE?) and Actual FTEs.
Do you have this column available to choose from in the Column Selector?
------------------------------
Jayden Bradow
Service Performance Analyst
Precision Administration Services (Pty) Ltd
------------------------------
Original Message:
Sent: 08-28-2019 13:55
From: Chris Cover
Subject: Intraday
Is it possible to add a field to choose from in Intraday, the 'Required FTE' that is currently available within the schedule? Currently, only forecasted FTE and actual FTE is available within Intraday. We would find it beneficial to show Required FTE, Actual FTE, and the FTE difference between those two numbers. #optimizer
#AskMeAnything(AMA)
------------------------------
Chris Cover
Workplace Safety & Insurance Board
------------------------------