Legacy Dev Forum Posts

 View Only

Sign Up

Campaign schedule system failure

  • 1.  Campaign schedule system failure

    Posted 06-05-2025 19:15

    devkike | 2023-09-09 10:28:11 UTC | #1

    Hello, we are configuring outgoing campaigns and when testing, establishing a schedule, when the campaign ends at its maximum time, it goes crazy and goes from having contacted 10 people, for example, to 350... Do you know if there is any incident regarding this? ? We have tested it in preview, progressive and predictive and the same thing happens, and the contact list contains their correct time zone, Europe/Paris or Europe/Madrid.

    And then when we download the list of contacts, ININ OUTBOUND NOT CONTACTABLE TIME appears, but it only happens with the time set, and only when said time ends, which is when it goes crazy. It is very strange since the rest of the contacts have been called well, If we remove the schedule there is no error.

    Thnx


    system | 2023-10-09 20:02:33 UTC | #2

    This topic was automatically closed 31 days after the last reply. New replies are no longer allowed.


    This post was migrated from the old Developer Forum.

    ref: 21917