Profile

Mr. Patrick Colburn

Contact Details

My Content

1 to 7 of 7 total
Posted By Patrick Colburn 09-22-2017 13:44
Found In Egroup: PureEngage On-Premises
\ view thread
Wondering if there is an easy way to build schedules with no built in OPA. I am looking to do a long term schedule sceario wtih real agents, but want to use a consistent assumed overhead assumption for the entirety of the schedule scenario. Is there a way to build a schedule without the system scheduling ...
Posted By Patrick Colburn 12-19-2016 14:23
Found In Egroup: PureEngage On-Premises
\ view thread
When reviewing data at the weekly and the monthly level, i see a discrepancy between the two views. When looking at the weekly view, the calculated and required is higher than the monhtly/yearly. Can anyone tell me why these dont match, im assuming they should be identical. Pat
Posted By Patrick Colburn 05-04-2016 19:17
Found In Egroup: PureEngage On-Premises
\ view thread
Hi, I have a grasp on the overlays where there is an entered distribution (Always use entered distribution, and calculate using specified starting and ending impact). I struggle with the other option where it says the below. Always Calculate Disregarding Impacts and Distributions Can someone ...
Posted By Patrick Colburn 04-14-2016 15:05
Found In Egroup: PureEngage On-Premises
\ view thread
Hi All, In the Genesys training manual there are many references to an On Demand Module Managing Shrinkage. I am looking for any insight on how to generate information to create future shrinkage predictions. I cannot find any information in the traning modules beyond the On Demand Module above which ...
Posted By Patrick Colburn 11-05-2015 14:46
Found In Egroup: PureEngage On-Premises
\ view thread
I have access to the report scheduler in Work Force Management. From what i can tell i can only access these reports through the generate reports tab. Curious if there is a way to have them save in csv format directly to my harddrive.
Posted By Patrick Colburn 10-12-2015 19:56
Found In Egroup: PureEngage On-Premises
\ view thread
I have access to the report scheduler in Work Force Management. From what i can tell i can only access these reports through the generate reports tab. Curious if there is a way to have them save in csv format directly to my harddrive.
Posted By Patrick Colburn 10-09-2015 14:28
Found In Egroup: PureEngage On-Premises
\ view thread
Is it possible to schedule a report to save to a path on my harddrive or a shared drive?