If those activities do not exist on the work plan that was used to generate the particular shifts in the first place, then we will not be able to optimize them and those shifts should be untouched. To explicitly not touch those shifts then: "To ensure that the rescheduling process does not apply to shifts that you modify manually, select the Do not reschedule manually modified shifts check box."
------------------------------
Jay Langsford
VP, R&D
------------------------------
Original Message:
Sent: 04-01-2024 09:52
From: Judith Jimenez
Subject: Adding an ad-hoc activity to a schedule
Does this remove any exceptions that have been added already? We load our scheduled training for the week on Sunday, if we reschedule, would that remove all of the exceptions we loaded on Sunday?
------------------------------
Judy Jimenez, Call Center Operations Manager
CURE Auto Insurance
------------------------------
Original Message:
Sent: 03-28-2024 12:33
From: Gina Palmer
Subject: Adding an ad-hoc activity to a schedule
But remember that, if you Reschedule to optimize the Breaks and Lunches, your "Required Staff with Shrinkage" changes, so you lose the historical forecasting information. If you had updated the forecast and wanted to be able to see what the staffing was with the old forecast compared to what it is with the updated forecast, that is gone.
------------------------------
Gina Palmer
Manager, Workforce Management
Papa, Inc.
Original Message:
Sent: 03-28-2024 12:29
From: Shelby Cronk
Subject: Adding an ad-hoc activity to a schedule
David,
If you are adding an activity to a schedule, using the ideal time or now, I assume the question is "does the system reoptimize breaks/meals to meet the newest shrinkage addition" and the short answer is: no, it does not.
The way to get the system to take in these types of changes (in addition to pulling in work plan changes) is to Reschedule at the top of the screen. You can choose which activity codes are eligible to reschedule and whether or not to allow manually modified schedules to be rescheduled.
Rescheduling will have the system reoptimize any flexible activities based on your latest ad hoc addition.
------------------------------
Shelby Cronk
C1