Hi,
A 4-on / 4-off schedule in Genesys WFM is not configured directly in the work plan alone - that's why it's not behaving as expected.
Work plans define the possible shifts and rules, but the actual pattern (like 4-on / 4-off) is controlled by the rotation.
To achieve this, you'll need to:
-
Create a work plan with your valid shifts (which you've already done).
-
Create a rotation that follows a 4 days ON / 4 days OFF pattern.
-
Assign this rotation when generating schedules.
A couple of key points:
-
Setting all days as "optional" in the work plan won't enforce the pattern
-
The rotation is what actually drives the sequence of work vs. days off
-
Make sure your rotation length is 8 days to match the 4-on / 4-off cycle
Once the rotation is set correctly, the schedule generation should follow that pattern.
Hope that helps!
------------------------------
David Betoni
Principal PS Consultant
------------------------------