Genesys Cloud - Main

 View Only

Sign Up

  Thread closed by the administrator, not accepting new replies.
  • 1.  WFM - Break optimization

    Posted 01-21-2019 12:07
    No replies, thread closed.

    Is there a way to optimize the breaks or must they be scheduled manually per employee?  


    #Unsure/Other

    ------------------------------
    Roisin Floyd
    Wren Data Ltd.
    ------------------------------


  • 2.  RE: WFM - Break optimization

    Posted 01-22-2019 07:07
    No replies, thread closed.
    If you are using load-based schedule generation, then activities will be optimized based on interaction forecast volume, AHT, and distribution along with agent capabilities and work constraints. The degree of flexibility or inflexibility of schedules is largely due to work plan configuration (e.g., several versus very few valid possible break start times).

    So, if you have 100 agents in one work plan that only has 4 possible and valid early break start times, then there won't be much flexibility. If however that work plan was modified to have, by variable shift start time and/or variable early break start time, say 25 possible and valid early break start times, the scheduling engine would have greater flexibility.

    ------------------------------
    Jay Langsford
    Senior Director, Workforce Optimization Engineering
    ------------------------------