Yes - in Genesys Cloud, you can create a time-off plan that includes multiple time-off activity codes, and within that plan, you can specify a single HRIS time-off type code (such as one from SAP SuccessFactors). This HRIS code is then used by the integration when communicating time-off requests to SAP.
So, to clarify:
• Time-off plans are the correct configuration entity (not "activity plans").
• Within a single time-off plan, you can:
• Include multiple Genesys time-off activity codes (e.g., vacation, sick leave, personal day).
• Associate the entire plan with one SAP time-off type code.
• This means that any time-off request made with any of those activity codes will be mapped to the same SAP code during integration - which works well when those codes share the same balance in SAP.
------------------------------
Vidas Placiakis
Genesys
------------------------------
Original Message:
Sent: 07-25-2025 09:40
From: Tanima Das
Subject: Clarification needed for HRIS integration - Multiple Genesys activity codes (Time Off) mapping capability with one HR Absence code (HR platform-SAP Success Factor)
Hi Vidas, thanks for your response. Just to clarify, does this mean we can create a single activity plan for multiple time-off types and configure it with a defined SAP code within the plan using HRIS integration?
------------------------------
Tanima Das
------------------------------
Original Message:
Sent: 07-23-2025 17:41
From: Vidas Placiakis
Subject: Clarification needed for HRIS integration - Multiple Genesys activity codes (Time Off) mapping capability with one HR Absence code (HR platform-SAP Success Factor)
It is possible to map a single time-off type from the HR platform (e.g., SAP SuccessFactors) to multiple Genesys Cloud time-off activity codes. This is typically managed through the Genesys time-off plans, which serve as the bridge between the HRIS code and the WFM activity codes.
Depending on your needs, you can:
• Use a single time-off plan configured with the SAP code and associate it with multiple Genesys activity codes.
• Or use multiple time-off plans, each mapped to a different Genesys activity code(s), but all sharing the same SAP time-off type code.
Keep in mind that when the same SAP time-off type is used, all associated Genesys activity codes will contribute to the same time-off balance for the agent.
Also, if you're using a single SAP time-off type and don't anticipate changes, you can hardcode the SAP code in the workflow, rather than retrieving it dynamically from the HRIS.
------------------------------
Vidas Placiakis
Genesys